A journey in the realms of
large-scale construction projects where MB Crusher attachments prove to be the
transformative solution.
The saying '' Rome wasn't
built in a day'' no longer applies to modern days where contractors are faced
with tight deadlines, logistical complexities, environmental concerns, and low
profit margins.
Those who redefined the
traditional approaches employing MB Crusher attachments instead of stand-alone
machines have proved that - whether nestled within bustling urban centres or
stretching across vast remote landscapes- any big project operation is
streamlined by integrating MB Crusher attachments into the existing equipment.
For all those contractors
who work hard to enhance overall project efficiency, please know that the
solution is to integrate the equipment at the site with MB Crusher attachments
to minimize equipment footprint and optimize resource utilization. Let the
journey begin to see how it is done!
Day
1 India: Building a Township in Maharashtra
Maharashtra is one of
India's biggest commercial and industrial centres, no wonder why the government
pushed for the construction of more infrastructures.
Bhoomi Earthmovers Pvt Ltd
had to build an entirely new town and the challenges were numerous – tight
schedules, waste management, environmental concerns, plus the hurdle of dealing
with granite boulders during excavation.
They stepped away from
bringing a stand-alone machine to the site, instead, they chose the powerful
combination of the Sany SY220 excavator and the MB Crusher BF90.3 Crusher
Bucket. This duo efficiently processed the boulders at the site, converting
waste into reusable aggregate. Bhoomi Earthmovers gained a competitive edge in
this large-scale construction by optimizing productivity and achieving cost
savings
Day 2 Egypt: It’s not an
oasis, it is the New Administrative Capital in the desert
Building 435 miles of the
New Administrative Capital in the Egyptian desert demanded innovative solutions
to ensure efficiency without compromising quality.
The MB Crusher BF120.4 and
the client Doosan DX340 played a pivotal role in repurposing existing rocks
into high-quality aggregate ready to be used without having to face hurdles
like the lack of roads, escalating material prices, and logistical nightmares.
Using the MB Crusher unit
resulted in staggering daily savings of $1,401.18 dollars showcasing the
cost-efficiency and sustainability of using the attachment.
Day
3 & 4 from Mexico to Saudi Arabia: a new train lines to an underground
parking
Choosing MB Crusher
attachments provided cost-saving, productivity and sustainability in new building
constructions. The same benefits with also extreme versatility are provided
when working over long distances.
Like the construction of
the 'Tren Maya' 932 miles of train line cutting through the Yucatán forest
where the MB Crusher units have transformed local material into usable product
without having to wait or buy outsourced aggregates.
Or like in downtown Riyadh,
in Saudi Arabia, the epicentre of Vision 2030 where the jaw crusher bucket
BF80.3 is solving the logistic issues for a 65 feet deep excavation project.
From the darkest forest to
the desert dunes going through vibrant cities jobs in these areas seem to have
different logistics requirements, but in reality, they are very similar.
In the forest or the desert
reaching the job site is a challenge itself, there are few or no roads and it
takes time. Urban hubs have traffic regulations and usage of heavy machinery is
increasingly more complicated.
Different scenarios, with a
common solution: enhance the usage of the heavy equipment with an MB Crusher
attachment and logistic nightmares are solved, costs are reduced and the
environment is preserved.
Maybe
Rome could have been built in a day with the MB Crushers unit, who knows?