Ramky Infrastructure
Limited, one of India's leading integrated sustainable infrastructure
development companies, has been awarded a prestigious contract valued at Rs.
215 crores by the Hyderabad Metropolitan Water Supply and Sewerage Board
(HMWSSB). This significant achievement further reinforces Ramky
Infrastructure's commitment to advancing sustainable urban infrastructure.
This contract entails the
provision of Manning, Operation, and Maintenance (O&M) services for five
years. These services shall be rendered to twenty Sewage Treatment Plants
(STPs) with a combined capacity of 714.3 MLD. The STPs are situated within the
jurisdiction of the Hyderabad Metropolitan Water Supply and Sewerage Board
(HMWSSB), including those located in Amberpet, Nallacheruvu, Pedda Cheruvu, and
other designated areas. Furthermore, the contract includes the management of
associated Intercept and Diversion (I&D) systems.
Commenting
on the contract, Mr. Yancharla Rathnakara Nagaraja, Managing Director of Ramky
Infrastructure Limited, said, “We are honored to have been entrusted
with this critical contract by the Hyderabad Metropolitan Water Supply and
Sewerage Board. This project aligns with our vision of creating sustainable
urban infrastructure that meets the growing demands of India's cities. It is a
testament to our ongoing efforts to transform urban spaces with cutting-edge
environmental solutions.”
This new initiative adds to
Ramky Infrastructure's impressive track record in wastewater treatment. It has
successfully implemented STPs at key locations such as Kokapet, Miralam, and
Nagole. These plants play a vital role in treating sewage from surrounding
areas and preventing untreated wastewater from flowing into the Musi River.
Ramky Infrastructure employs advanced technologies, including Sequential Batch
Reactors (SBR) that require minimal manpower, yet deliver high efficiency
through PLC and SCADA systems, ensuring superior performance in all projects.
Ramky Infrastructure's vast
experience and exceptional project execution are further demonstrated by its
ability to complete complex projects ahead of schedule. Notably, the company
delivered the STP projects in a record 16 months, surpassing the original
24-month timeline. This achievement underscores Ramky Infrastructure's
expertise in addressing the challenges of sewage treatment and its unwavering
commitment to delivering timely, sustainable solutions.