Central Railway (CR) has completed the safety assessment of the indigenous 'Kavach 4.0' automatic train protection system across 340 km of track within its Pune, Solapur, and Nagpur divisions. Designed to meet the highest standards of 'Safety Integrity Level 4' (SIL 4), the system aims to prevent train collisions and enhance overall railway safety and operational efficiency. 

A senior CR official stated that the recent assessment included the Ahilyanagar-Yeola route in the Pune division, bringing the total length of track evaluated across the three divisions to 337 km. The system is designed to prevent trains from passing red signals, control overspeeding, and automatically apply brakes when necessary. 

The 133 km-long Ahilyanagar-Yeola section comprises 12 stations and is equipped with the necessary infrastructure to monitor train speed, direction, and traffic movement. Additionally, assessments have been completed for the 104 km-long Amla-Chhindwara section in the Nagpur division and the 99 km-long Daund-Kurduwadi section in the Solapur division. 

An Italian team conducted an independent assessment of the system, examining its key safety features. These include overspeed protection, speed limit monitoring, automatic whistle alerts at level crossings, and safety measures to prevent trains from passing signals at 'danger' (red lights).


Current Issue

Current Issue

11-2026

Connect Us :

WhatsApp