Ace Energy Infrastructure Pvt. Ltd. Achieves Landmark Success with Record-breaking Intersect Method Pipeline Installation Across Subansiri River in Assam
Ace Energy Infrastructure
Pvt. Ltd. accomplishes a significant milestone as they successfully install a
3600-meter pipeline of 24" diameter across the Subansiri River in Assam.
This remarkable achievement was made possible by utilizing the intersect method
of Horizontal Directional Drilling (HDD), positioning it among the largest
pipeline installations worldwide using this technique.
This incredible
accomplishment was executed for Indradhanush Gas Grid Limited (IGGL) (a joint
venture of oil and gas companies such as Indian Oil Corporation Limited, Oil
and Natural Gas Corporation Ltd., GAIL (India) Limited, Oil India Limited, and
Numaligarh Refinery Limited) with MECON Limited, India Ltd. serving as the
Project Management Consultant (PMC) as part of a project to extend the Pradhan
Mantri Urja Ganga (National Natural Gas Grid) to the North Eastern states of
India, a project envisioned by the honourable Prime Minister of India and ably
steered by the Ministry of Petroleum and Natural Gas Govt of India.

Speaking about this
achievement, Mr. Ravneet Singh,
Director, Ace Energy Infrastructure Pvt. Ltd., says, “This endeavour stands
among the largest HDD crossings undertaken globally and is a good demonstration
of the engineering talent and competencies that infrastructure companies in
India are capable of. Our team of experts tackled several technical and
logistical challenges with precision and dedication, resulting in the
completion of this complex HDD crossing milestone.”
Speaking about this
achievement, Mr. Tarun Singh, Director,
Ace Energy Infrastructure Pvt. Ltd., says, "Our experience in
executing challenging projects and our dedication to quality will always be
critical in delivering a solution that meets the requirements. Together, we
have proven that no challenge is insurmountable when we unite our expertise,
passion, and determination."
Speaking about this
achievement, Mr. Ajit Kumar Thakur, CEO,
Indradhanush Gas Grid Ltd., says, "This is a monumental accomplishment
not only for Indradhanush Gas Grid Limited and Ace Energy Infrastructure Pvt.
Ltd., but also for the country’s strategic vision of expanding access to
cleaner energy use by setting up the natural gas infrastructure to the major
demand centres in North East parts of the country."

What made this an extra
special effort apart from the technical challenges in the drilling were:
1. Extremely difficult site conditions:
Both banks of the river where the equipment was to be mobilised were at an
extremely inaccessible location, in North Lakhimpur and Majuli Districts of
Assam, with no access to motorable roads. While access to the Majuli side was
achieved by the construction of a temporary coffer dam across the Lohit River,
which too was washed out due to flash floods in early April in pre-monsoon
rains, Access across the river itself was on a rudimentary ferry that could
barely accommodate cars. What made the task even more challenging was the
narrow weather window when equipment could be mobilised, with the entire area
being waterlogged between June and October.
2. Several months of job planning: A
well-planned approach is the key to success. Their detailed planning of
methods, equipment, and manpower several months in advance played a crucial
role in the successful execution of this highly challenging crossing. Equipment
such as tracking and guidance tools, a recycling unit, mud pumps, drill pipe,
swivels, and various tooling apart from the HDD rigs with ample redundancy
befitting such a major crossing were procured months in advance and had to be
mobilised at the remote project site.
3. Hard Work, and determination:
The Ace Energy Infrastructure team worked tirelessly day and night over the
past five months, without a single break.
4. Perseverance and using setbacks to learn
and grow: From a flash flood washing out the only access to the
site (the temporary coffer dam) to breakage in drill strings, the team faced
adverse situations and continued towards their commitment to excellence.
5. Improvising methods using feedback from people on the ground: During the course of the execution of the works, the best-made plans need to be re-looked at and re-engineered in light of the dynamics of the project site. Feedback from experienced personnel at the site proved invaluable. Their firsthand experiences and insights provide crucial guidance for continuous improvement.